New: Guided pilots now available for machine shops, aerospace, and medical teams. Talk to the team →
Features

Every tool your quality team needs, in one system

From blueprint ballooning to certificate of conformance — GaugeFlow covers the full manufacturing quality lifecycle. No gaps. No disconnected tools.

Core

Blueprint Ballooning

Upload engineering drawings and mark up critical dimensions, tolerances, and features with numbered balloons. Each balloon becomes a traceable inspection point that flows through the entire quality process.

  • Mark dimensions directly on PDF drawings
  • Auto-number balloon sequences
  • Link balloons to inspection templates
  • Support GD&T callouts and surface finishes
  • Revision-aware — balloons update with drawing changes
ASY-47-2186-REV-B
Rev B
Open PDFClick any balloon to sync the side report.
Ballooned ASY-47-2186-REV-B engineering drawing
1

True Position

Balloon #1 · Front view

Section
Inspection characteristic
GD&T Callout
.000
A
B
C
Reference
Front view
Summary
Lower positional-tolerance frame on the main circular view.
Status
Mapped

Inspection Plan

14 linked balloons

Drawing Notes

8 linked balloons
Core

Inspection Template Generation

Inspection templates are auto-generated from your balloon data. No re-keying dimensions. No copying tolerances into spreadsheets. The template is built the moment you finish ballooning.

  • Auto-populated from balloon data
  • First article, in-process, and final templates
  • Custom fields and inspection methods
  • Linked to drawing revision
  • Reusable across jobs and orders
Inspection
ASY-47-2186 Rev B
In Progress
Char #Feature NameNominal+Tol−TolActualInstrumentStatus
1Outside Diameter2.5000+0.0010.0012.5004CMM-003Pass
2Inside Diameter1.7500+0.0020.0021.7488CMM-003Fail
3Overall Length4.2500+0.0050.0054.2517Micrometer-12Pass
4Thread Depth0.1250+0.0010.0010.1253Thread Gauge-7Pass
5Surface Finish Ra32+8028Profilometer-2Pass
6Concentricity0.0000+0.0030.0000.0021CMM-003Pass
7Bore Diameter0.8750+0.0010.001Pending
5 of 7 Complete — 71%
Compliance

First Article Inspection — AS9102

Full AS9102 FAI workflow with Form 1 (Part Accountability), Form 2 (Material & Process), and Form 3 (Characteristic Accountability). Auto-populated from your inspection data — no duplicate entry.

  • Complete Form 1, 2, 3 support
  • Auto-populated from inspection data
  • Full, partial, and delta FAI types
  • Export to PDF or customer-required formats
  • Linked to drawing, material certs, and results
Form 2 — AS9102

Product Accountability — Raw Material

In Progress

Documents the raw material, special processes, and functional testing performed on the first article. Links to material certifications and process records.

1Material Name/Specification
2Supplier
3Cert Number
4Heat/Lot Number
5Special Process Sources
6Process Specification
7Functional Test Procedure
Core

In-Process & Final Inspection

Track quality during production, not just at the end. In-process checkpoints catch issues early. Final inspection confirms conformance before shipping.

  • In-process checkpoints tied to operations
  • Final inspection with go/no-go decisions
  • Record actual measurements against specs
  • Attach photos, notes, and supporting data
  • Automatic conformance calculations
Inspection
ASY-47-2186 Rev B
In Progress
Char #Feature NameNominal+Tol−TolActualInstrumentStatus
1Outside Diameter2.5000+0.0010.0012.5004CMM-003Pass
2Inside Diameter1.7500+0.0020.0021.7488CMM-003Fail
3Overall Length4.2500+0.0050.0054.2517Micrometer-12Pass
4Thread Depth0.1250+0.0010.0010.1253Thread Gauge-7Pass
5Surface Finish Ra32+8028Profilometer-2Pass
6Concentricity0.0000+0.0030.0000.0021CMM-003Pass
7Bore Diameter0.8750+0.0010.001Pending
5 of 7 Complete — 71%
Management

Calibration Management

Track every gage, micrometer, caliper, and instrument in your shop. Know what's current, what's due, and what's overdue — at a glance.

  • Full instrument registry
  • Calibration scheduling and due dates
  • Status tracking (current, due soon, overdue)
  • Calibration certificate storage
  • Link instruments to inspection records
Documentation

Certificates of Conformance

Generate professional cert packets that include inspection results, material certs, calibration records, and any other documentation your customer requires.

  • Auto-generated from inspection data
  • Include material certs and test reports
  • Customizable cert templates
  • Digital signatures
  • PDF export for customer delivery
First Article Inspection Report
AS9102 Form 3 — Characteristic Accountability, Verification and Compatibility Evaluation
Report ID
FAI-2024-0047
Part Number
FLG-7042-A
Part Name
Precision Flange Assembly
Serial Number
SN-20241201-003
FAI Type
Full
FAI Reason
New Part
Date
2024-12-01
Characteristic Results
Balloon #Char RefRequirementActual ResultStatus
1A2.5000 +/- 0.0012.5003Pass
2B1.7500 +/- 0.0021.7506Pass
3C4.2500 +/- 0.0054.2481Pass
4D0.1250 +/- 0.0010.1246Pass
5E32 Ra max28 RaPass
Inspector
M. Chen2024-12-01
Quality Engineer
R. Patel2024-12-02
Customer Approval
Pending Approval
Compliance

Material & Lot Traceability

Trace every part back to its material certification, heat/lot number, supplier, and inspection results. Full chain of custody from receiving to shipment.

  • Material cert storage and linking
  • Heat/lot number tracking
  • Supplier traceability
  • Chain of custody from raw material to shipped part
  • One-click traceability reports
Control

Revision & Document Control

Every document — drawings, inspection plans, procedures, certs — is revision-controlled. Full history of changes. No more hunting for the latest version.

  • Automatic revision tracking
  • Change history with timestamps
  • Approval workflows
  • Controlled document distribution
  • Obsolete version management
Document Control
Search documents...
Folders
Quality Manual
4
Work Instructions
12
Procedures
8
Forms
15
Templates
6
DocumentRevStatusOwnerLast Modified
QMS-001Quality Manual
DCurrentJ. Torres2024-11-08
WI-010Inspection Procedure — Dimensional
BCurrentM. Chen2024-10-22
WI-011Inspection Procedure — Surface Finish
CUnder ReviewM. Chen2024-12-01
SOP-004Nonconforming Material Control
ACurrentR. Patel2024-09-15
FRM-020First Article Inspection Checklist
ECurrentK. Novak2024-11-30
WI-015Gauge Calibration Procedure
ADraftL. Adams2024-12-03
Compliance

Audit Trails

Every action in GaugeFlow is logged — who did what, when, and why. Complete, immutable audit trail for every record in the system.

  • Immutable activity log
  • User, timestamp, and action recorded
  • Filterable audit history
  • Exportable for auditor review
  • Supports regulatory audit requirements
Document Control
Search documents...
Folders
Quality Manual
4
Work Instructions
12
Procedures
8
Forms
15
Templates
6
DocumentRevStatusOwnerLast Modified
QMS-001Quality Manual
DCurrentJ. Torres2024-11-08
WI-010Inspection Procedure — Dimensional
BCurrentM. Chen2024-10-22
WI-011Inspection Procedure — Surface Finish
CUnder ReviewM. Chen2024-12-01
SOP-004Nonconforming Material Control
ACurrentR. Patel2024-09-15
FRM-020First Article Inspection Checklist
ECurrentK. Novak2024-11-30
WI-015Gauge Calibration Procedure
ADraftL. Adams2024-12-03
Analytics

Reporting & Export

Generate inspection reports, cert packets, FAI reports, calibration schedules, and traceability reports. Export to PDF, Excel, or customer-required formats.

  • Pre-built report templates
  • Custom report builder
  • PDF and Excel export
  • Scheduled report generation
  • Customer-specific formatting
Reports Dashboard
Period:Dec 2024
Parts Inspected
847
This month
Pass Rate
98.2%
+0.4% vs last month
Avg Inspection Time
12 min
−2 min vs last month
Open NCRs
3
1 critical
Monthly Inspection Volume
112
Jul
134
Aug
98
Sep
156
Oct
142
Nov
168
Dec
Recent Activity
FAI Report #FAI-0047 approved
12 min ago
NCR-2024-018 escalated to critical
1 hr ago
WI-011 submitted for review
3 hr ago
Calibration due: CMM-003
5 hr ago
Inspection ASY-47-2186 started
Yesterday
Security

Permissions & Security

Role-based access control ensures the right people see the right data. Inspectors, managers, admins — each with appropriate permissions.

  • Role-based access control
  • Department-level permissions
  • Read/write/admin granularity
  • Audit log of permission changes
  • SSO/LDAP integration (Enterprise)
Reports Dashboard
Period:Dec 2024
Parts Inspected
847
This month
Pass Rate
98.2%
+0.4% vs last month
Avg Inspection Time
12 min
−2 min vs last month
Open NCRs
3
1 critical
Monthly Inspection Volume
112
Jul
134
Aug
98
Sep
156
Oct
142
Nov
168
Dec
Recent Activity
FAI Report #FAI-0047 approved
12 min ago
NCR-2024-018 escalated to critical
1 hr ago
WI-011 submitted for review
3 hr ago
Calibration due: CMM-003
5 hr ago
Inspection ASY-47-2186 started
Yesterday
Infrastructure

Local & Private Deployment

For organizations that require local data control — ITAR, defense, or simply preference — GaugeFlow can be deployed on-premise or in a private cloud environment.

  • On-premise installation
  • Private cloud deployment
  • Air-gap capable
  • Network isolation support
  • Full data sovereignty
Document Control
Search documents...
Folders
Quality Manual
4
Work Instructions
12
Procedures
8
Forms
15
Templates
6
DocumentRevStatusOwnerLast Modified
QMS-001Quality Manual
DCurrentJ. Torres2024-11-08
WI-010Inspection Procedure — Dimensional
BCurrentM. Chen2024-10-22
WI-011Inspection Procedure — Surface Finish
CUnder ReviewM. Chen2024-12-01
SOP-004Nonconforming Material Control
ACurrentR. Patel2024-09-15
FRM-020First Article Inspection Checklist
ECurrentK. Novak2024-11-30
WI-015Gauge Calibration Procedure
ADraftL. Adams2024-12-03

See these features in action

Book a personalized demo and we'll walk through the features most relevant to your operation.

Try Demo